Wehold Projects
LEGAL · BUILD · EQUIPPED · STAFFED
ESTD. 2025, CHENNAIACROSS INDIA
Wehold Projects

Legal, Build, Equipped and Staffed

Hospitals. Medical Universities and Colleges. Clinics. Laboratories. Schools. Engineering Colleges and Universities.

3
TRACKS
30
STAGES
75+
LICENCES
2
CITIES
LegalBuildEquippedStaffedLegalBuildEquippedStaffedLegalBuildEquippedStaffedLegalBuildEquippedStaffed
LegalBuildEquippedStaffedLegalBuildEquippedStaffedLegalBuildEquippedStaffedLegalBuildEquippedStaffed
02WELCOME AND CONTENTS

Welcome.

Every institution starts with a plan and a piece of land. What decides the outcome is whether the approvals, the building, the equipment and the people arrive in the right order. This website shows how Wehold Projects holds all four together, for hospitals and medical colleges first, and then for clinics, laboratories, schools, colleges, engineering institutions and universities.

ESTD
2025
HQ
CHENNAI
ALSO IN
MUMBAI
ACROSS
EVERY STATE OF INDIA
03THE IDEA

Projects rarely fail inside one discipline. They fail in the joins.

A hospital needs approvals, a building, equipment and a team. Most owners appoint four separate firms for these, and then carry every gap between them alone. We hold all four under one roof, so that nothing falls between them.

FOR PROMOTERS, TRUSTS AND INSTITUTIONS IN EVERY STATE OF INDIA

“We will not take a delivery mandate on a project we have told you is not viable..
04THE FOUR WORDS
01

Legal

Approvals, essentiality, affiliation, licences and renewals.

02

Build

Site, design, construction, inspection and handover.

03

Equipped

Specification, sourcing, import, installation and training.

04

Staffed

Faculty and staff verified at source, with records that hold on any day.

Supported by a technology platform for compliance tracking, and by advisory for sale, purchase and joint ventures.

05WHAT WE DO

Six service lines under one roof.

Take one line on its own, or all six under a single accountability.

0101

EPC and construction management

Site intelligence, master planning, statutory design, civil procurement, execution, inspection readiness and handover.

0202

Equipment supply

Category planning, specification mapping, sourcing across five manufacturing countries, import and clearance, installation and lifecycle care.

0303

Regulatory and affiliation consulting

State approvals, essentiality, university consent, national regulator filings, licences, renewals and deficiency management.

0404

Staffing and faculty recruitment

Requirement mapping against the standard, recruitment, verification at source, appointment records, attendance and workload systems.

0505

Technology and platform

Hospital and academic systems, compliance tracking, regulator format reporting and data protection.

0606

Sale, purchase and JV advisory

Readiness, regulatory due diligence, valuation support, structuring, negotiation, transition and integration.

06HOW WE WORK

Three tracks. One way of measuring.

A
A10 STAGES

Hospitals

From the first question to a running hospital.

B
B12 STAGES

Medical university and college

From bare land, or from a hospital that is already running.

C
C8 STAGES

Clinics and day care

From catchment study to a running clinic.

“Complete means the test is met and the evidence is filed. Not before.”

HOW YOU CAN APPOINT US

01

Diagnostic

Viability arithmetic and a written recommendation, including the case against proceeding.

02

Detailed project report

Technical and financial report, master plan, equipment schedule and approvals calendar.

03

Regulatory mandate

Approvals, essentiality, affiliation, filings, licences, renewals and deficiency management.

04

Project management

Oversight of your own contractor, equipment, approvals and schedule.

05

Turnkey delivery

End to end across all six lines under a single point of accountability.

06

Retained compliance

Calendar, renewals, inspection preparation and change tracking after opening.

07–19THE TRACKS · EVERY STAGE, IN THE ORDER IT MUST CLOSE

Eight tracks. Every stage, in the order it must close.

Pick a track and open any stage. Stages close in the order shown, whatever the state, the land or the regulator.

APAGE 07

Hospitals

Ten stages, from the first question to a running hospital.

We plan multi-specialty, super-specialty, secondary care and district hospitals.

10
STAGES
6
APPROVAL GATES
4
TYPES OF HOSPITAL
THE HOSPITAL TRACK10 STAGES

Stages can run in parallel — construction and equipment overlap, licensing runs alongside commissioning. The order in which they close does not change.

HospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversities
HospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversitiesHospitalsMedical UniversitiesClinicsLaboratoriesSchoolsCollegesUniversities
08HOSPITALS, CONTINUED

Where a hospital project stops dead.

1

Radiation shielding layout

Settled before the structure is cast.

2

Occupancy certificate and final fire clearance

In hand before registration is filed.

3

Biomedical waste operator contract

And authorisation.

4

Clinical establishment registration

Not one patient before it.

5

Radiation operating licence

Before any imaging machine is switched on.

6

Scheme and insurer empanelment

Start early, because it decides how soon the hospital begins to earn.

“The building is only one gate out of many.”

09–10HOSPITAL CLINICAL PACKAGES

The rooms that decide whether a hospital works.

Delivered through our construction and equipment lines, with specialist partners, under one accountability. One contract, one programme, one evidence file.

01

Operating theatres

Modular theatres of every kind: single, double, minor, hybrid and speciality. Airflow, filtration, pressure zones, pendants and flooring, tested before handover.

02

Medical gas pipeline

Oxygen, vacuum, medical air and other gases. Outlets planned from your bed mix, source plant, alarms, testing and certification.

03

ICU, NICU and PICU

Bed layout and spacing, air handling, gas panels, isolation rooms, nurse call, monitors and ventilators, planned for the level of care you will offer.

04

Dialysis units

Station planning, water treatment, drainage, infection control zones, equipment and the registrations the unit needs to open.

05

Cath lab and imaging

Shielding fixed before the structure is cast. Radiation equipment approval, safety officer and operating licence, in the right order.

06

Support departments

Emergency, labour room, sterile supply, blood centre and central laboratory, planned as one flow with the clinical floors.

DESIGNED TO
NABHISO 14644 — cleanroomsISO 7396-1 — medical gasAERB — radiation·checked against your state's rules

What you receive at handover.

As built drawings, air change and particle count reports, pressure and light readings, equipment manuals and user training records.

AFTER HANDOVER

Maintenance cover

Annual maintenance options for air handling, gas plant and equipment.

Re-validation

Scheduled tests and calibration, placed on your compliance calendar.

Renewals and inspection

Licence renewals and preparation for accreditation and regulator visits.

22–24BUILD · EQUIPPED · STAFFED

The standard, for each of the four words.

02

Build

Payment follows proof, not time.

We run the construction side for you, with one rule: a stage is paid only when it is checked and found complete.

01

Site and design review

Soil, access, layout and services checked before drawings are final.

02

Plan approvals

Municipal, fire and pollution board plans filed in the right order.

03

Fixed scope contracts

Contractors priced against a clear list of work.

04

Independent measurement

Work measured by someone who is not paid by the contractor.

05

Stage payments

Money released after inspection of the stage, not on the calendar.

06

Quality checks

Materials and workmanship sampled and recorded.

07

Fire and utility readiness

Power, water, gas and fire systems tested before handover.

08

Handover file

Drawings, test reports and certificates in one folder.

A building that is late costs less than a building that is wrong.

03

Equipped

Specified line by line, not copied from a brochure.

Equipment is chosen for the services you will offer, the staff you will have and the rules you must meet.

01

Medical equipment

Listed department by department, with make options and service support.

02

Laboratory equipment

Specified with the vendor, who also trains the staff.

03

Furniture and fixtures

Wards, classrooms, labs and offices planned to the layout.

04

IT and hospital systems

Records, billing, networks and security connected from day one.

05

Vendor comparison

At least three quotes compared on the same list.

06

Installation and calibration

Fitted, tested and calibrated before use.

07

Training and warranty

Staff trained, warranty terms and service dates written down.

08

Asset register

Every item tagged, with its licence and renewal date.

If a department cannot be inspected on opening day, it is not ready to be listed as complete.

04

Staffed

Faculty cannot be arranged for inspection week.

Every degree, registration and record is checked with the issuing body before it enters the file.

VerifiedAT THE SOURCE
01

Verified at source

Degrees, registrations and experience checked with the issuing body.

02

Norms based roster

Headcount mapped to council rules, department by department.

03

Recruitment pipeline

Senior hires planned well before they are needed.

04

Induction

Policies, systems and safety training at the very start.

05

Retention plan

Pay bands and growth paths set to keep key people.

06

Duty rosters

Shifts that match patient load and teaching hours.

07

Inspection file

Every staff record ready to show on the day.

08

Ongoing check

Renewals of registrations tracked all the time.

People are the one part of an institution that cannot be bought late.

25TECHNOLOGY AND AFTER OPENING

The work does not stop on opening day.

Licences expire, rules change and inspections return. Our system keeps watch, so your team does not have to remember.

0-day
ALERT BEFORE EVERY RENEWAL FALLS DUE
T1

Ninety day alert

Every renewal flagged well before it falls due.

T2

Compliance calendar

All licences, owners and dates on a single screen.

T3

Change alerts

Circulars and rule changes read and matched to your institution.

T4

Evidence repository

Certificates, reports and approvals stored and easy to find.

Monthly

01
  • Staff and registration check
  • Open items review

Quarterly

02
  • Safety drills and audit
  • Equipment calibration

Yearly

03
  • Renewals and inspections
  • Disclosure and fee filings

“AI prepares the first draft. People take every decision, and sign it.”

26ALSO BUILDING

Also building: more than new projects.

Not every client starts with an empty plot. We also work with institutions that already exist, and with those that want to change hands.

0101

Sale, purchase and joint ventures

Institutions valued, checked and transferred with their licences intact.

0202

Existing institutions

Gaps in approvals found and closed before a renewal or an inspection.

0303

Government partnerships

Support for bidders in public private projects, from tender to approvals.

OUR ADVISORY NETWORK
Architecture and planningLegal counselChartered accountantsMedical planningEnvironment consultantsFire safety consultantsValuationRecruitment partners
ONE REPORT FORMAT

Three tracks. Thirty stages. One report format, so you always know where you stand.

27HOW TO START

Four questions, then a diagnostic.

1

What do you want to build?

2

Where is the land, or the building?

3

Who is the sponsoring body?

4

What is your target opening date?

D
One
report
THE DIAGNOSTIC

A diagnostic report on land, licences, cost and timeline. You decide what happens next.